LANDSLIP REMEDIATION – JAMIESON
When: 2022
Client: Mansfield Shire Council
Overview: Due to recent storm damage, a landslide occurred on the Jamieson Sideling track, impacting access to the area via road. BPS were engaged by the Mansfield Shire Council to facilitate an engineering feature survey for the purpose of designing site rehabilitation.

Works include:
The slope above and below the track were imaged by BPS engaged specialist AUAV Aerial Drone and UAV Services for LiDAR data at 10m spacings to map an active slip along Sideling Track through dense tree cover. Local control and engineering feature survey and design was completed by BPS. The output was highly accurate topographic 3D modelling of the complex landslip.
Browns Project Solutions
Contact Us
Quick Links



Browns Project Solutions acknowledges and pays respect to the past, present and future Traditional Custodians and Elders of this nation and the continuation of cultural, spiritual and educational practices of Aboriginal and Torres Strait Islander peoples.
Browns Project Solutions are also committed to advancing diversity and inclusivity throughout all aspects of our workplace, ensuring equal opportunity and respect for all.